Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.
Last updated: July 22, 2019
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2023
In an attempt to reduce the number of plan submittals, the following items are required in the construction documents for all Residential Site Improvement projects.
Last updated: 10/15/2019
Quick reference guide to flood damage repairs in the floodplain.
The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit.
Last updated: 01/01/2023