Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Permitting and plan review guideline for EERC with example inspection report.
Last updated: 11/25/2019
In an attempt to reduce the number of plan submittals, the following items are required in the construction documents for all Residential Site Improvement projects.
Last updated: 10/15/2019
Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings, and affects renovation and demolition permits for public or commercial buildings issued by municipalities on or after January 1, 2002.
Last updated: 06/09/2022
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: 01-01-2021
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: 10/09/2019
Guidelines for applicants wishing to remove or demolish a building or structure from a property.
Last updated: 01-01-2022
Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance
Guidelines for opening and using an advance pay account (APA).
Last updated: June 17, 2020