Use a mixture of filters or keywords to find documents and resources by department, type or topic.

TxDOT Ramp Closure Requirements

This document is maintained by the Texas Department of Transportation (TxDOT).

Security Control Plan
Advance Pay Account Guidelines (CE1051)

Guidelines for opening and using an advance pay account (APA).

Last updated: June 17, 2020

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

Ordinance Notes and Plat Notes
Multi-Family Habitability Article IV
2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance

Commercial Reroofing Only Worksheet (CE1076)

For reroof only commercial projects. 

Last updated: 10-02-2019

Top 10 Things to Know About Permitting (CE1165)

Tips about building construction permitting in the City of Houston.

Last updated: 04/28/2022