Annual Engineers' Certification
Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

SWQ Requirements - Montgomery
Ordinance Notes and Plat Notes
SWQ Guidance Manual
Example COH SWQMP
Multi-Family Habitability Article IV
Fire Code Ordinance 2007-777

City of Houston, Texas, Ordinance Number 2007-777. An ordinance amending the City of Houston Fire Code relating to administrative fees. 

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

Drawing#01571-01 SWPPP Standard Details