Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

TxDOT Water Details
Code Change Proposal Example 2

Second example of a completed code change proposal form.

Garbage Collection Plan - Chapter 42 Amendments

A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.

Ordinance Notes and Plat Notes
Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

TxDOT Sanitary Sewer Details
Multi-Family Habitability Article IV