Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023

Community Rating System - FEMA Fact Sheet

FEMA Fact Sheet - Federal Insurance and Mitigation Administration

Community Rating System

 

Last updated: 06/18/2020

Garbage Collection Plan - Chapter 42 Amendments

A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.

Code Change Proposal Example 1

Example of a completed code change proposal form.

Make Sign Survey Payments Online

Online guide to pay sign surveys

Last updated:  June 23, 2023

Alternate Method Guideline (CE1103)

Guideline for submitting requests for alternate methods, code interpretations and modifications.

Updated 01-01-2023

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance