Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

PPI 2021

Public information plan for the Community Rating System.

 

Last updated: 1.21.2021

Code Change Proposal Example 2

Second example of a completed code change proposal form.

Garbage Collection Plan - Chapter 42 Amendments

A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

Ordinance Notes and Plat Notes
Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance