Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Vehicle Updates and Changes form

Please contact us at the information below.
Phone: 832.393.5603 and can also Email: [email protected].

Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Letter of Map Change Process

Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.

Last updated: July 22, 2019

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Extraterritorial Jurisdiction Plan Review and Submittal Requirements (CE1041)

Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.

Last updated: 01/01/2022

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Code Change Proposal Form (CE1291)

This form should be completed when submitting a proposed code change during an established comment period.

Last updated: 03/02/2020

Phased Construction Permitting Options (CE1098)

Options for phase construction permitting and plan review

Last updated: 10/08/2019

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019