Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 10/30/2019
For Plumbing, Structural, Electrical and HVAC reinspections.
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed please fill out an additional form.
Last updated: 10/31/2019
This form shall be completed and submitted to the field inspector for the following residential projects: new construction, additions, complete remodels (all interior walls and ceilings are removed, or home square footage is changed ), and complete new ac systems.
Last Updated: 10/30/2019
This form is to be completed by building management and is to certify smoke alarm installation in existing apartment buildings at the time of the Life Safety Inspection.
Payment form for structural, electrical, mechanical, and plumbing overtime inspection