Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The form is used to calculate an actual occupant load in educational spaces governed by the Texas Educational Agency (TEA) rules that limit maximum class size to approximately 2/3rds of that specified by the IBC occupant load factor identified in Table 1004.1.2 for educational spaces.
Updated 01-01-2023
Last Updated: June 2015
Projects within the right-of-way or public utilities easement.
Application procedures for renting a transient meter.
Last updated: 12/15/2022
Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
A general overview of the residential building permit process. This presentation will outline the basic steps involved in submitting plans for review, obtaining permits, and scheduling inspections for one and two-family dwellings.
Last updated: 5/22/2023
This document is a brief overview of the typical commercial building permit process for the City of Houston. Links are added for reference. Please contact Building Code Enforcement for assistance with specific questions pertaining to your individual project: 832.394.9494. Presentation, May 31, 2007.
Last updated: 07/18/2023