Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

TxDOT Water Details
Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

Public Hearing - Replat With Notification

Last Updated: June 2015 

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. Listed below are the required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process.

Last updated: 03/02/2023

Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: 01-01-2021

Roof Repair and Cool Roof Guidelines (CE1209)

The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.

Updated: 10/16/2019

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

Transient Meter Application Procedures

Application procedures for renting a transient meter.

Last updated: 12/15/2022

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022