Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Substantial Damage Estimate Request Form

Application form to request a substantial damage estimate of a property.

Pipeline Questionnaire

Questionnaire to be submitted with applications for new or existing pipelines.

Last updated: March 2019

Waiver Request for Temporary Placement of Manufactured Home Due to Harvey Damage (CE1321)

Request form for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Advance Pay Account Request Form (CE1052)

Application form to request an advance pay account (APA).

Last updated: May 9, 2023

Existing Pipeline Application

Application for permit ordinance for an existing gas or liquids pipeline in a street.

Last updated: March 2019

Pipeline Permit Procedures

Procedures for permitting pipeline street crossings and application checklist. 

Last updated: March 2019

Code Change Proposal Example 2

Second example of a completed code change proposal form.

New Pipeline Application

Application for permit ordinance for a new gas or liquids pipeline in a street.

Last updated: Mar. 6, 2023

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023

Substantial Damage Determination Appeal Form

Application form to appeal a determination of substantial damage.