Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Code Change Proposal Form (CE1291)

This form should be completed when submitting a proposed code change during an established comment period.

Last updated: 03/02/2020

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

PPI 2021

Public information plan for the Community Rating System.

 

Last updated: 1.21.2021

Code Change Proposal Example 2

Second example of a completed code change proposal form.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance