Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023

Convert Residence to Commercial Business (CE1106)

The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit. 

Last updated: 01/01/2023

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

15-01-R Residential Drainage Plan Example

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

17-13-R Elevation Examples

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.   

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

09C13 Interior Steel Partition (Fire Rated – 1 HR)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Quick Start I Plan Review Procedures (CE1071)

To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance

Last updated: 08-02-2023

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.