Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Large Job Application - Non-Billable

Application for water lines or fire hydrants. 

Last updated: 06/13/2022

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.

User Guide for online WCR Application Process

Step by step guide for applying for a wastewater capacity letter online.

 

Last updated: January 18, 2022

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Sewer Tap Permit Procedure

Procedures for obtaining a sanitary sewer tap permit.

Last updated: 8/1/2018

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022