Use a mixture of filters or keywords to find documents and resources by department, type or topic.

TxDOT Ramp Closure Requirements

This document is maintained by the Texas Department of Transportation (TxDOT).

Street Performer Application

Traffic and Drainage Operations

Security Control Plan
Street Performer Boundary (Map)
Permit for Painting House Numbers on Curbs

Traffic and Drainage Operations

Freeway Ramp Closure Application

The Mayor’s Office of Special Events accepts applications between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, except for City-observed Holidays.

Neighborhood Parade Notification Sheet
Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022