Use a mixture of filters or keywords to find documents and resources by department, type or topic.
City of Houston Standard Detail Title Block - ANSI A (8.5 x 11 inches) uploaded 12-12-2023
Service unit equivalent table for determining impact fees. (form UA005)
Last updated: May 20, 2021
Application for a sanitary sewer tap permit.
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.
Transfer capacity to another site within the same treatment plant. (form UA004)
Last updated: 07.20.2019. This document is maintained by the Utility Analysis.