Use a mixture of filters or keywords to find documents and resources by department, type or topic.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2024
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Last Updated 10/10/2019
Checklist of plan review requirements for electronic locks.
Last updated: 11/18/2019
Residential plan review checklist for Traffic (OCE-002)
Last updated: 8/23/2021
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
New single-family residential plans must be submitted with this checklist in order for plans to be considered as complete for the purpose of plan review.
Last updated: 4/10/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: February 2, 2022
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects.