Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.
Last updated: 01/01/2022
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.
Updated: 10/16/2019
Commercial plan review checklist for Traffic (OCE001)
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects.
Updated 11/15/2022