Use a mixture of filters or keywords to find documents and resources by department, type or topic.

TxDOT Ramp Closure Requirements

This document is maintained by the Texas Department of Transportation (TxDOT).

Street Performer Application

Traffic and Drainage Operations

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Security Control Plan
Street Performer Boundary (Map)
Permit for Painting House Numbers on Curbs

Traffic and Drainage Operations

16-04-C Commercial Stucco Details (Wood Frame)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

Freeway Ramp Closure Application

The Mayor’s Office of Special Events accepts applications between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, except for City-observed Holidays.