Use a mixture of filters or keywords to find documents and resources by department, type or topic.

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

16-04-C Commercial Stucco Details (Wood Frame)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

02951-01_2023_11_MOD.dwg

Street Cut for Concrete Pavement Replacement/Restoration Age of Pavement <= 5yrs

Updated 12-18-2023

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)

Pavement Repair Detail for Street Cuts  (Non-Reinforced Concrete & Brick Pavement)

Updated 11-26-2023

17-10-C Repair of Flooded 2-Hour Fire Wall

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2023

Residential Standby Generator Permit and Inspection Guide (CE1060)

This handout was created to aid customers with understanding the permit and inspection process to install a residential standby generator. Included are the required permits, items that must be available to city field inspectors at the construction site, and the items that the city inspectors will be verifying in the field during the inspection process.

Last updated: 01/01/2023