Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Hotel Human Trafficking Prevention Signage - Spanish (PDF)

Signage for hotel human trafficking prevention training in Spanish

Last updated: 5-14-2020

Trabajos de reparacion residencial de danos por tormentas

Storm damage repair guidelines for single-family homes and duplexes in Spanish.

Last updated: 9/20/2017

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

13-01-R Swimming Pool Demolition

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

16-04-C Commercial Stucco Details (Wood Frame)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

Ejemplo de la Solicitud de Permiso de Edificacion (CE1263S)

Ejemplo de la Solicitud de Permiso de Edificacion (example building permit application in Spanish)

Convert Residence to Commercial Business (CE1106)

The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit. 

Last updated: 01/01/2023

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

Sign Administration General Prerequisites Requirements

General prerequisite requirements for plan review. This form must be completed by the sign contractor.

Last updated: February 2, 2022