Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

02951-01_2023_11_MOD.dwg

Street Cut for Concrete Pavement Replacement/Restoration Age of Pavement <= 5yrs

Updated 12-18-2023

TxDOT Water Details
House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

List of Standard Details – Street cut Details

List of Standard Details – Street cut Details

Updated 11-26-2023

Approved Fabricator Guidelines (CE1285)

Guide explains the requirements and procedures of the COH approved fabricator program. 

Last updated: January 2024