Use a mixture of filters or keywords to find documents and resources by department, type or topic.

How To Apply For COO Inspection via Email

How-To Guide On Applying For Certificate of Occupancy via Email

Revised 06-04-2021

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

TxDOT Water Details
House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

Approved Fabricator Guidelines (CE1285)

Guide explains the requirements and procedures of the COH approved fabricator program. 

Last updated: January 2024

Registration Process for Electrical Master and Contractor (CE1203)

Registration & Renewal Process for Electrical Master & Contractor.

Last updated: January 2024