Use a mixture of filters or keywords to find documents and resources by department, type or topic.

12-03-R Generator location requirements for single family residence

Generator location requirements for single family residence.

Transient Meter Forms for CIP Projects

Application forms for transient meters on capital projects only (CIP projects).

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

19-05-R Two family dwelling horizontal separation

Last Updated 10/10/2019

18-02-R Two family dwelling vertical separation

Two family dwelling vertical separation

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022

22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall) 

Updated 01/17/2023