Use a mixture of filters or keywords to find documents and resources by department, type or topic.

12-03-R Generator location requirements for single family residence

Generator location requirements for single family residence.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

TxDOT Water Details
House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

Approved Fabricator Guidelines (CE1285)

Guide explains the requirements and procedures of the COH approved fabricator program. 

Last updated: January 2024

TxDOT Sanitary Sewer Details
19-05-R Two family dwelling horizontal separation

Last Updated 10/10/2019