Use a mixture of filters or keywords to find documents and resources by department, type or topic.

01562-02_2023_11_MOD.dwg

01562-02 MOD DWG uploaded 12-14-2023

02317-01 Sanitary Sewer Embedment Trench Zone Backfill For Dry-Wet Stable Trench

02317-01 SS Embedment Trench Zone Backfill For Dry-Wet Stable Trench

6 Pump System

Design guideline drawings for Submersible Lift Station 6 Pump System

02083N01 4'-0 Diameter Fiberglass Manhole Notes

02083N01 4'-0 Diameter Fiberglass Manhole Notes

01512-01 to 01512-12 Traffic Control
  • TCP Notes Channelizing Device and Barricades
  • TCP Overall Traffic Control Layout
  • Traffic Control Layout
  • TCP One Lane Closure Phase 1 & 2
  • TCP One Lane Closure
  • TCP Typical 3-Way Intersection Phase 1 of 3
  • TCP Typical 3-Way Intersection Phase 2 of 3
  • TCP Typical 3-Way Intersection Phase 3 of 3
  • TCP 4-Way Intersection Phase 1 of 4
  • TCP 4-Way Intersection Phase 2 of 4
  • TCP 4-Way Intersection Phase 3 of 4
  • TCP 4-Way Intersection Phase 4 of 4
  •  
01580-04 Construction Sign ReBuild Houston Project Drainage Utility Fee Funding
01571-01_ Storm Water Pollution Prevention Plan Detail_2010_07.pdf

Storm Water Pollution Prevention Plan Detail

Updated 11/24/2023

Tree Protection General Requirements

Tree Protection General Requirements PDF

02775-02 to 02775-03

02775-02 Wheel Chair Ramp Details

02775-03 Parallel Curb Ramp

02751-01 to 02752-01

02751-01 Concrete Pavement Details

02752-01 Pavement Expansion and Construction Joint Details