Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Easement Reverter Flowchart.
This document maintained by the Joint Referral Committee.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit.
Last updated: 01/01/2023
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: February 2, 2022
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.