Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Transient Meter Application Procedures

Application procedures for renting a transient meter.

Last updated: 12/15/2022

List of Registered Special Inspectors

List of approved special inspectors. 

Last updated: 04/10/2024

List of Registered Fabricators

The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.

Last updated: 04/10/2024

Sponsor Change Form

Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.

List of Licensed Sign Contractors

List of currently licensed sign contractors with the City of Houston

Last updated:  April 18, 2024

List of City Approved Contractors to Install Small Water Meters

Last update: 04/01/2024.

List of Registered Independent Third Party Energy Technicians

List of Registered Independent Energy Technicians.

Updated April 19, 2024