Use a mixture of filters or keywords to find documents and resources by department, type or topic.

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

13-01-R Swimming Pool Demolition

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

16-04-C Commercial Stucco Details (Wood Frame)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

Convert Residence to Commercial Business (CE1106)

The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit. 

Last updated: 01/01/2023

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

Sign Administration General Prerequisites Requirements

General prerequisite requirements for plan review. This form must be completed by the sign contractor.

Last updated: February 2, 2022

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

Electronic Lock Plan Submittal Checklist (CE1337)

Checklist of plan review requirements for electronic locks.

Last updated: 11/18/2019

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.