Use a mixture of filters or keywords to find documents and resources by department, type or topic.
last updated: 10/28/2019
Form must be completed by the Special Inspection Agency.
last updated: 10/28/2019
Guide explains the requirements and procedures of the COH approved fabricator program.
Last updated: January 2024
Form must be completed by the Special Inspection Agency
Last updated: 10/25/2019
Last updated: 04/03/2024
Application required to renew Special Inspector certification.
Last updated: 10/25/2019
List of approved special inspectors.
Last updated: 04/10/2024
Drawings may be used to document a 1-hour fire-rated exterior wall design for wood-framed structures located less than 5-feet to the property line after the effective dates of the adopted 2015 IBC and IRC codes.
11.30.2021
Form must be completed by the Special Inspection Agency.
Last updated: 10/30/2019
The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.
Last updated: 04/10/2024