Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Application to request the Building Official's approval for a proposed temporary building (< 180 days)
Updated February 2024
This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.
Last updated: March 2024
Last updated: 10/09/2019
Last updated: 5/9/2018
To assist in correctly identifying the intended occupancy Group of care facilities, the facility owner shall provide a completed, sign and notarized worksheet with all applications submitted for building permit, plan review, or occupancy inspection.
Updated: 10/10/2019
For reroof only commercial projects.
Last updated: 10-02-2019
Request for deferred plan submittal.
Last updated: 03-23-2022
This form is to be completed by the applicant to obtain permits for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: Jan. 2024
The code provisions applicable to facilities with hazardous materials, high hazard and high-piled combustible storage depends on the type of products (commodities) stored and the arrangement and height of the storage.
Last updated: 5/11/2018
When a fill or excavation permit is required, two sets of drawings must be provided that will clearly show the proposed scope of work and include the existing site elevations and the proposed site elevations.
Last updated: 10/10/2019