Use a mixture of filters or keywords to find documents and resources by department, type or topic.
last updated: 10/28/2019
Form must be completed by the Special Inspection Agency.
last updated: 10/28/2019
Guide explains the requirements and procedures of the COH approved fabricator program.
Last updated: January 2024
When a fill or excavation permit is required, two sets of drawings must be provided that will clearly show the proposed scope of work and include the existing site elevations and the proposed site elevations.
Last updated: 10/10/2019
Form must be completed by the Special Inspection Agency
Last updated: 10/25/2019
Last updated: 5/9/2018
This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.
Last updated: March 2024
List of approved special inspectors.
Last updated: 04/10/2024
Form must be completed by the Special Inspection Agency.
Last updated: 10/30/2019
The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.
Last updated: 04/10/2024