Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Approved Storm Water Products
Approved Wastewater Product List
Approved wastewater products
Last updated: March 7, 2024
Approved Wastewater Products
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)
This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.
Last updated: March 2024
Frequently Missed Inspection Items (CE1354)
Last updated: 11/22/2019
Approved Water Product List
Approved water products by the Design and Construction Standards Group
Last updated: April 5, 2024
Approved Street and Bridge Products
Occupancy Compliance Inspection Handout
All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.
Revised 06-04-2021