Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

00495 Post Bid Procedures
Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

Sizing of Heating and Cooling Equipment and Ducts - Residential (CE1292)

This form shall be completed and submitted to the field inspector for the following residential projects: new construction, additions, complete remodels (all interior walls and ceilings are removed, or home square footage is changed ), and complete new ac systems.

Last Updated: 01/01/2023

ERRC Special Inspection Report (CE-1385)

The Emergency Responder Radio Coverage (ERRC) Special Inspection/Survey Report is used when performing a Third-Party Special Inspection of an installed ERRC system, or when running a Survey for an existing building.

Mechanical Inspection Request Form for Occupied Residences (CE1048)

This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.

Revised 03/08/2024

Apartment Smoke Alarm Certification Form (CE1265)

This form is to be completed by building management and is to certify smoke alarm installation in existing apartment buildings at the time of the Life Safety Inspection.