Use a mixture of filters or keywords to find documents and resources by department, type or topic.

IDM Chapter 9.2.01 Supplement

Chapter 9.2.01 supplement for design rainfall events, pipe sizes and placement, and inlet

Current Groundwater Plant Design Guidelines

Current groundwater plant design guidelines (effective Oct. 1, 2021)

Last updated: July 1, 2021

2022 IDM Cover Letter and Executive Summary

Executive summary and cover letter for the 2022 edition of the Infrastructure Design Manual

 

Last updated: July 1, 2022

2022 IDM Redlines
2023 Review Cycle IDM Redlines

2022-2023 Review Cycle Infrastructure Design Manual Redlines

Updated 11-27-2023

ERRC Designer 2023

Update October 9, 2023

BUILDING CODE ENFORCEMENT EMERGENCY RESPONDER RADIO COVERAGE (ERRC) DESIGNER/LEAD INSTALLATION PERSONNEL QUALIFICATION STATEMENT 

Form CE_1348

ERRC Special Inspection Report (CE-1385)

The Emergency Responder Radio Coverage (ERRC) Special Inspection/Survey Report is used when performing a Third-Party Special Inspection of an installed ERRC system, or when running a Survey for an existing building.

ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

2023 Cover Letter & Executive Summary

2023 Cover Letter and  Executive Summary

Updated November 27, 2023

Overtime Inspection Payment Form for APA (CE1055)

Payment form for electrical, mechanical, and plumbing overtime inspection