Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Traffic Control Form

Last update: February 24, 2022

Request Storm Payment Form

Request form for DPC storm payment.

Last updated: 5/9/2022

Code Change Proposal Form (CE1291)

This form should be completed when submitting a proposed code change during an established comment period.

Last updated: 03/02/2020

6 Pump System

Design guideline drawings for Submersible Lift Station 6 Pump System

Lift Station Guideline Title Index

Design guideline drawings for submersible lift stations Civil, Mechanical, and Structural drawing set

Vehicle Updates and Changes form

Please contact us at the information below.
Phone: 832.393.5603 and can also Email: [email protected].

SWQ Requirements - Fort Bend
6 Pump VFD Pump System

6 VFD Pump System

HPW SWQ Structural Control Bond
Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.