Use a mixture of filters or keywords to find documents and resources by department, type or topic.

2016 Design Manual For Submersible Lift Stations

Engineering Design Manual for Submersible Lift Stations July 2016

ERRC Designer 2023

Update October 9, 2023

BUILDING CODE ENFORCEMENT EMERGENCY RESPONDER RADIO COVERAGE (ERRC) DESIGNER/LEAD INSTALLATION PERSONNEL QUALIFICATION STATEMENT 

Form CE_1348

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Chapter 13 2021
ERRC Special Inspection Report (CE-1385)

The Emergency Responder Radio Coverage (ERRC) Special Inspection/Survey Report is used when performing a Third-Party Special Inspection of an installed ERRC system, or when running a Survey for an existing building.

2023 List of Standard Details_Tree & Hardscape Details.pdf

List of Standard Details-Tree and Hardscape Details

ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

Overtime Inspection Payment Form for APA (CE1055)

Payment form for electrical, mechanical, and plumbing overtime inspection

Standard Details Redlines from 2022-2023 Review Cycle

Standard Details Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023