Use a mixture of filters or keywords to find documents and resources by department, type or topic.

15-03-R Residential Ramp
08C07-2 Commercial Ramp & Landing - 2
13-04-R Masonry Column for Wrought Iron Fences
12-07-R Flitch Plate Beam
21-03-M Short Retaining Wall
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

11-04-R Residential 4 foot Wood Bulkhead
Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

08C07-1 Commercial Ramp & Landing - 1
24-03-R Foundation for Additions

Revised 03/25/2024