Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Credit Access Business Instructions and Checklist

Initial application and renewal instructions and checklist for credit access business registration.

Banner District
Checklist for Development Assistant Contract
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Flood Damage Repair Checklist for Single-family Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair on single-family residential property.

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

Flood Damage Repair Checklist for Commercial and Multifamily Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair to a commercial or multifamily residential property.

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Electronic Lock Plan Submittal Checklist (CE1337)

Checklist of plan review requirements for electronic locks.

Last updated: 11/18/2019