Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Initial application and renewal instructions and checklist for credit access business registration.
The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.
Revised 08/15/2023
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: February 2, 2022
Checklist for obtaining a floodplain development permit for flood damage repair on single-family residential property.
Checklist of plan review requirements for electronic locks.
Last updated: 11/18/2019
This form shall be completed and submitted to the field inspector for the following residential projects: new construction, additions, complete remodels (all interior walls and ceilings are removed, or home square footage is changed ), and complete new ac systems.
Last Updated: 01/01/2023